Copied to clipboard

Flag this post as spam?

This post will be reported to the moderators as potential spam to be looked at


  • stephencai 21 posts 131 karma points
    Aug 02, 2019 @ 09:24
    stephencai
    0

    Umbraco schedule lock

    I am preparing an endpoint for umbraco schedule with short interval time. The function is creating some item in umbraco. I am facing a problem of duplication of item creation.

    How can I set a "lock" to make sure the current schedule have been done before a new schedule start again?

    Any advise?

  • This forum is in read-only mode while we transition to the new forum.

    You can continue this topic on the new forum by tapping the "Continue discussion" link below.

Please Sign in or register to post replies